Metro Map Hyderabad PDF Free Download, Hyderabad Metro fare & Time Table Chart PDF Free Download, Metro Network Map Offline Map in PDF.
Metro Map Hyderabad PDF Free Download
A Rapid Transit System Serving Hyderabad, Telangana, India, Is Called The Hyderabad Metro. Hyderabad Metro Network Currently Has 56 Active Stations. The Hyderabad Metro Route, Metro Lines, Service Operation Timings, First Train, Last Train, Route Map, Fare Chart, Top Attractions Near Metro Station, Metro Station Nearby, News And More Are Important And Useful Information.
Facts Worth Knowing About The Metro In Hyderabad
- The Hyderabad Metro Is An Indian City’s Rapid Transit System That Serves Hyderabad, Telangana.
- A Total Of About 72 Kilometers Will Be Covered By The Hyderabad Metro Rail Network Over Three Corridors.
- Prime Minister Narendra Modi Inaugurated A 30 Km (19 Mi) Stretch From Miyapur To Nagole With 24 Stations On November 28, 2017.
- N. Chandrababu Naidu, The Then-chief Minister Of The United Andhra Pradesh State, Launched The Metro Rail Project For The First Time In 2003.
- Three Distinct Lines—blue: Nagole To Raidurg, Green: Falaknuma To Parade Ground, And Red: Miyapur To Lb Nagar—will Make Up The Hyderabad Metro Rail (Hmr), Which Will Run.
- Niz Is The Mascot Of The Hyderabad Metro Rail. Its Origins Are In The Word Nizam, Who Ruled Hyderabad’s Princely State.
- The Government Of India Named Hyderabad Metro The Best Urban Mass Transit Project In November 2018.
- Regenerative Braking Technology (Rbt) And Communication-based Train Control (Cbtc) Technology Are Used To Create An Environmentally Friendly, Fully Automated, And Best-in-class Transportation Framework That Will Help Reduce Carbon Footprints And Overall Pollution.
- Major Bus Hubs Including Miyapur, Mgbs, Koti, Dilsukhnagar, Charminar, And Jubilee Bus Station Are Connected By Hmr, Which Also Integrates With Rail Hubs Like Secunderabad, Begumpet, And Nampally.
- Devadas, A 2018 Telugu Film Starring Nani And Rashmika Mandanna, Was The First Movie To Be Filmed In The Metropolis Of Hyderabad.
- In Accordance With The Metro Act, Hyderabad Metro Rail (Hmr) May Impose A Number Of Penalties, Including Ticketless Travel, Excessive Travel, Excessive Station Stays, And Excessive Station Stays Beyond Origin Stations.
- Various Penalties Are Imposed For Offenses In Compliance With The Metro Railways (Operations & Maintenance) Act, 2002’s Provisions. Penalties Range From Rs. 50 To Rs. 5000 And Include Up To 10 Years In Jail.
- The Base Fare For Up To 2 Kilometres Is Rs. For More Than 26 Km, The Maximum Fare Is Rs. 60. 10% Discount Is Available On All Smart Card-based Trips.
- All Metro Stations Have Automatic Vending Machines (Avm) Or Ticketing Offices Where You Can Purchase A Smart Card Or A Token.
- On Weekdays And Weekends, The Hyderabad Metro Rail Runs From All Terminal Stations From 6:30 Am To 2:00 Pm.
Phase 2 Information
63 km Hyderabad Metro Phase 2 project with an Airport Express Line is currently in the proposal stage. In February 2020, its detailed project report (DPR) with 3 new lines & extensions of existing lines was submitted to the Telangana government for approval.
The Airport Express Line’s foundation stone was laid by Telangana’s Chief Minister on December 9, 2022. The project is expected to cost Rs. 6,250 crore and will be executed by Hyderabad Airport Metro Limited (HAML).
As per the latest plan revealed by Hyderabad Metro’s MD, the Phase 2 project will include 4 elevated corridors – 1 new line and 3 extensions of the existing lines built in the 67 km Phase 1 project. It hasn’t been finalized whether this phase will be developed on the EPC method or on the PPP (Public-Private Partnership) route.
- Estimated Cost: Rs. 8453 crore (Pending Route Finalization & Approval)
- Phase 2 Deadline: Not Finalized (Pending Route Finalization & Approval)
- My Completion Estimate: 2030 (no sooner, if approved by state government in 2023)
New Phase 2 Plan
Airport Express Line: Mindspace Junction – Rajiv Gandhi International Airport (RGIA)
- Length: 32 km
- Type: Elevated (28.5 km), At-Grade (1 km) & Underground (2.5 km)
- Number of Stations: 8
- Stations Names: Bio-Diversity Junction, Nanakramguda, Narsingi, TS Police Academy, Rajendranagar, Shamshabad, Airport Cargo, Airport Terminal
- Note: This new line will pass through Gachibowli and Himayathsagar via the Outer Ring Road (ORR) to connect up with Rajiv Gandhi International Airport in Shamshabad. Its Detailed Project Report (DPR) for this extension was prepared by the Delhi Metro Rail Corporation in 2018-19. The line is estimated to cost Rs. 6,250 cr and will be executed by Hyderabad Airport Metro Limited (HAML) – a new special purpose vehicle. Funds are expected to be provided by Hyderabad Metropolitan Development Authority (HMDA) and GMR Group.
Red Line Extension: Miyapur – Lakdikapul
- Length: 26 km
- Type: Elevated
- Number of Stations: N/A
- Station Names: N/A
- Note: This extension will connect and pass through Miyapur – BHEL – Kondapur – Gachibowli – Raidurg – Mehdipatnam – Masab Tank – Lakdi Ka Pul (located also on the Red Line) intersecting itself to form a small ring for the north-west quadrant of the city.
Blue Line Extension: Raidurg – Mindspace
- Length: 1 km
- Type: Elevated (1 km)
- Number of Stations: 1
- Stations Names: Mindspace Junction (interchange with Airport Express Line)
Blue Line Extension: Nagole – LB Nagar
- Length: 5 km
- Type: Elevated
- Number of Stations: N/A
- Station Names: N/A
- Note: this small extension of the Blue Line will connect up to the Red Line’s Nagole Station. Both station boxes at LB Nagar will likely be connected via foot overbridge (FOB), as the Red Line’s station is about 400m away from the Inner Ring Road.
Old Phase 2 Plan
The old plan consisted of the following 5 lines. Out of these, only 1 (the Blue Line’s extension from Raidurg to the RGI Airport) has been retained in the new plan. The rest are off the table.
- New Line: Tarnaka – ECIL (7 km)
Note: As per some news reports, a section of this line would have been built underground. - Line-1 – Red Line Extension: LB Nagar – Hayathnagar (7 km)
- Line-1 – Red Line Extension: Miyapur – BHEL – Patancheru (13 km)
- Line-3 – Blue Line Extension: Nagole – LB Nagar – Falaknuma – Shamshabad Airport (28 km)
- Line-3 – Blue Line Extension: Raidurg – Gachibowli – Shamshabad Airport (30.7 km)